Caltrans Records Show Possible Defects In New Bay Bridge’s Foundation

SAN FRANCISCO (CBS/AP) – Records have been found of an apparent defect in the construction of the San Francisco-Oakland Bay Bridge.

Records provided by Caltrans last fall show that a builder failed to report that a 19-foot section of concrete in the foundation of the span’s tower had not hardened before tests were conducted.

By failing to disclose the matter, the builder prevented further examination or repair of the concrete.

KCBS’ Jeffrey Schaub Reports:

Caltrans records show that two of the 13 piles built to hold up the main tower were also not tested properly.

Caltrans spokeswoman Tamie McGowen said in an email that the agency was confident in the structural integrity of the structure.

(Copyright 2012 by CBS San Francisco. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.)

Comments

One Comment

Leave a Reply

Fill in your details below or click an icon to log in:

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

More From CBS San Francisco

Get The New CBS SF Bay Area Local App
Got Our Weather App?

Listen Live