kpix-masthead kcbs-black-masthead

Pipe

Smoke rises from the Richmond Chevron refinery fire (CBS)

State, Federal Regulators Release Report On Chevron Refinery Fire In Richmond

The report concluded that a pipe ruptured due to severe sulfidation corrosion and there was a very low concentration of corrosion-inhibiting silicon in the ruptured pipe.

2013/02/13

(Sean Gallup/Getty Images)

2 Water Mains Burst Overnight In Redwood City

Two separate water mains broke Tuesday morning in Redwood City, flooding two homes and damaging an intersection, a city water department supervisor said.

2012/11/20

A crew at the scene of a Sunset District water main break (Tim Ryan/KCBS)

Water Main Break Shuts Down San Francisco Street

San Francisco Public Utilities Commission crews were at the scene of a water main break in the city’s Sunset District Monday afternoon, a utility spokeswoman said.

2012/09/17

Smoke rises from the Richmond Chevron refinery fire (CBS)

Chevron Considered Replacing Pipe Blamed For Refinery Fire

Chevron Corp. reportedly considered replacing a corroded Richmond refinery pipe nearly a year ago but decided it was good for another five years of service.

2012/08/14

San Bruno gas pipeline blast

’94 San Bruno Pipeline Upgrade Didn’t Include Explosion Site

Records show utility crews replaced five miles of aging gas pipes under a San Bruno neighborhood less than two decades ago but stopped just short of a segment that ruptured and exploded last year.

CBS San Francisco–2011/03/04

Year In Review: 2010 Top News Stories

NTSB Chair Rips PG&E Blunders On San Bruno Blast

The head of the National Transportation Safety Board said Pacific Gas & Electric’s record-keeping blunders leading up to the San Bruno natural gas pipeline explosion demonstrates a need for stepped up industry safety.

CBS San Francisco–2011/01/27

hard hat, construction, road closed

Fremont Water Pipeline Construction To Slow Traffic

Construction on a new water pipeline through Fremont is expected to affect commuters for the next couple of months. Crews began work Tuesday morning on the pipeline, starting near Paseo Padre Parkway at Grimmer Boulevard.

KCBS–2010/10/20

Listen Live!