Weather Create Challenges For New Bay Bridge Design

Tides, Weather Create Design Challenges For New Bay BridgeIt’s a flow of water bigger than the mighty Mississippi River - 390 billion gallons of water move in and out of San Francisco Bay twice a day, creating an engineering challenge for the designers of the new Bay Bridge.

More From CBS San Francisco

Music's Biggest Night
Your Bay Area Guide To Valentine's Day

Listen Live