Bay Bridge Repairs

Workers walk on a cable of the newly constructed eastern span of the San Francisco-Oakland Bay Bridge on May 23, 2013. (Justin Sullivan/Getty Images)

Temporary Fix May Allow New Bay Bridge To Open By Labor Day After All

A bridge engineering expert told a Bay Area transportation panel Wednesday that a short-term fix could allow the new eastern span of the Bay Bridge to open on schedule by Labor Day after all.

07/10/2013

Bay Bridge Repairs From Tanker Grazing Will Cost $3M, Take Four Months

Caltrans says it will take construction crews four months to repair the damage to the Bay Bridge from when a tanker ship grazed its fender and that it will cost $3 million.

01/25/2013

Follow

Get every new post delivered to your Inbox.

Join 55,692 other followers